CONSTRUCTION OF 2,000M JETTY BERTH 12-19 AT FEDERAL OCEAN TERMINAL (FOT), CALAVI

The project has been conceived as an extension of Berth 9, 10 & 11 jetty, using similar designs and construction techniques. 8 Nos of additional berths of approximately 250 meter each will be located along OGU Creek (Berth 12 to Berth 15) and the remaining Berth 16 to Berth 19 will be located after the channel (312 m width) along OGU Creek. The jetty will have 12 metre draft Chart Datum (lowest astronomical tide) and the berths will have the normal capacity of 6T/m², where the 3 No of Heavy load platforms (HLP) with capacity of 12T/ m².

Project Details

Completion Date
Jan 2014 – Dec 2019
Client
Deep Offshore Benin S.A