COOPER CAMERON WORKSHOP
COOPER CAMERON WORKSHOP, FOT, CALAVI
COOPER CAMERON WORKSHOP, FOT, CALAVI

Project Description

COOPER CAMERON WORKSHOP AT FEDERAL OCEAN TERMINAL, CALAVI

The Cooper Cameron expansion project was for the expansion of their off shore support facilities and included the basic and detail engineering. The Cooper Cameron Phase 1 facilities include:

  • Workshop facility of area 1,392.72 m²
  • Industrial reinforced concrete stacking area of 5,000m2 (capacity 100Tons/ m²)
  • Installation of an overhead gantry crane of 50 ton and various jib cranes
  • MEP installations

Project Details

Client
Cooper Cameron
Info
Main Contractor
WACCEC (PIL)
Period
2004 - Nov 2005