Project Description

CONSTRUCTION OF POWER DISTRIBUTION SYSTEM AT FEDERAL LIGHTER TERMINAL (FLT), CALAVI

The system covers the power needs for the entire FLT, eliminating the various existing power houses with a centralised Power house and 6 Substations.
Installation of 3 diesel generators of 2,000kVA each at the main power house including switchboards, transformer 0.400/11kV 4,000kVA, Supervision System Workstation and 2 PLC, UPS 6kVA, 400V, bus ducts, cables, accessories. Through aluminium MV armoured cable line the power will be distributed to the sub-stations, completed with switchboards, Transformer, UPS 2kVA (400V), cables and fixing accessories.

Project Details

Client
Benin INTELS Nig. sa.
Info
Main Contractor
WACCEC (PIL)
Period
Mar 2008 – Sep 2009