BRAWAL JETTY REHABILITATION AT FLT
F.L.T. REHABILITATION OF JETTY

Project Description

REHABILITATION OF JETTY #1 AT FEDERAL LIGHTER TERMINAL (FLT), CALAVI

The rehabilitation of 340m of jetty consists of 15m jetty on reinforced concrete pre-cast piles with reinforced concrete slab connected to the existing and new capping beams. The six quays of 56.05m/each include: new retaining wall in steel sheet piles 16m long, connected through tie rods 460 2¾’ to the rear sheet pile wall in reinforced pre-cast concrete sheet piles. The 15m deck includes beams supported by driven reinforced pre-cast concrete piles 24m long with square section located on a rectangular grid 3.5mx3.5m.

Project Details

Client
Benin Port Authority
Info
Main Contractor
WACCEC (PIL)
Period
Jan 2006 – Mar 2009