FLT WATER DISTRIBUTION SYSTEM

Project Description

CONSTRUCTION OF WATER DISTRIBUTION SYSTEM AT FEDERAL LIGHTER TERMINAL (FLT), CALAVI

The system is for a total daily requirement of 6,000m³ of industrial water per day (i.e. 600m³/H per 10H/day)for vessel water supply, to be delivered through No 12 hydrants with flow rate of 50 m³/H each. The Project includes Fire fighting with No. 6 hydrants (total flow rate Q= 108m³/H) and N. 4 supply points of Potable water (flow-rate of 2.5m³/H each = 10m³/H x 10H/day = 100m³/day – simultaneous utilisation).

Project Details

Client
Benin Port Authority
Info
Main Contractor
WACCEC (PIL)
Period
Sep 2007 – May 2009