FOT WATER DISTRIBUTION NETWORK

Project Description

CONSTRUCTION OF WATER DISTRIBUTION NETWORK AT BERTH 1, 2 AND 3 AT FEDERAL OCEAN TERMINAL (FOT), CALAVI

The facilities provide industrial water for offshore operations, potable and fire fighting water within the FOT and thus, improving the services provided to the Operators.
The system accommodates total daily requirement of 3,000m³ of industrial water per day for vessel water supply, to be delivered through 6 hydrants.
Fire fighting is provided by 4 hydrants and 4 supply points of potable water with maximum flow-rate of 100m³/day-2.5m³/H each.

Project Details

Client
Benin Port Authority
Info
Main Contractor
WACCEC (PIL)
Period
Mar 2008 – Aug 2010