INSTRUMENTATION BUILDING AT OGBOGU

Project Description

CONSTRUCTION OF ELECTRICAL AND INSTRUMENTATION BUILDING AT OGBOGU FLOW STATION (TOTAL PROJECT OML 58)

The project for Saipem is for the construction of an electrical and instrumentation building approximately 765M2 on plan.

  • Main Building compose of 5 different level (Lower Ground, Ground, Upper Ground, 1st Floor, and Roof Level)
  • Transformer Foundation 96 m2
  • Instrumentation Room with False Floor 224 m2
  • External work (4 nos. Cable Pit, 3 nos. Staircase, FM 200, and storm drainage utilities)
  • HVAC Platform steel structure

Project Details

Client
Saipem Contracting Benin S.A
Info
Main Contractor
WACCEC West African Construction and Civil Engineering Company S.A

Period
Aug 2010 - Feb 2011